NOTE: Select a special tool that matches the diameter of the line.
Install the special tool.
- Install the special tool so that the inner ring can be guided into the clamp spring.
2. Press the special tool into the clamp spring.
3. Disconnect the refrigerant line.
- Discard O-rings of circular cross-section.
4. Dock the refrigerant line.
- Check the clamp spring for damage.
- Carefully remove any damaged clamp springs using a thin piece of wire and install new springs.
5.
NOTE: Clean the connections using cooling oil and a lint-free cloth.
Press the indicator ring into the clamp spring.
6.
NOTE: Install new O-rings on the refrigerant lines.
NOTE: Apply clean refrigerant oil to the O-rings on the refrigerant lines before installation.
Connect the refrigerant lines.
- Check that the clamping spring is correctly fixed.
Visitor comments